Design. Build. Remodel. License# 1148495
Detached ADU

Custom Detached ADU Construction in Los Angeles

Design and build a standalone, fully independent guest house that maximizes your property’s potential. From custom architectural plans to premium construction and city permits, we deliver turnkey backyard homes tailored to your lifestyle. Schedule a Site Consultation.

  • Licensed & Insured

  • Transparent Pricing

  • Design & Permits

Call Us (323) 407-8977

Get a Free Estimate

Service Quote Form
Backyard Cottage before
Adu interior

Ground-Up Construction Excellence

OUR PROVEN SYSTEM

Building a detached ADU is a major investment that requires expert orchestration of multiple trades. At Kobzev Pro Contracting Group, we’ve refined the ground-up construction process into a transparent, phase-based system that eliminates guesswork and minimizes stress. From the initial soil evaluation to the final coat of paint, we provide a predictable roadmap for your new backyard home.

We specialize in the complex technical requirements unique to standalone structures in Los Angeles—including site grading, new foundation pouring, and independent utility connections. Our dedicated project managers handle every detail: custom architectural drafting, the entire LADBS permitting cycle, and full-scale construction management. We are committed to delivering a high-performance, energy-efficient living unit that seamlessly integrates into your property while meeting the highest industry standards for quality and safety.

  • Site Feasibility & Utility Planning

    We begin with a deep dive into your property’s lot lines, setbacks, and utility access. Our experts evaluate the ground conditions and plan the most efficient route for new sewer, water, and electrical lines to ensure a solid foundation for your standalone ADU.

  • Custom Design & Permit Approval

    Our architects design a custom floor plan that maximizes your available space and sunlight. We manage the full bureaucratic cycle with the City of Los Angeles, securing all structural and zoning permits so your project remains 100% legal and compliant.

  • Full Ground-Up Construction

    This phase covers everything from foundation pouring and framing to roofing and exterior finishes. Our licensed crews build your new ADU with precision, following strict California building codes and ensuring every structural element is built to last for generations.

  • Interior Finishing & Final Sign-Off

    The final stage brings your vision to life with premium cabinetry, flooring, and modern fixtures. After passing all final city inspections, we perform a detailed walkthrough to ensure every detail is perfect before handing you the keys to your new backyard home.

Kobzev Aleksey

Why Homeowners Choose Us for Custom ADU Builds

Building a standalone home from the ground up requires a contractor who understands the full complexity of modern residential engineering. At Kobzev Pro Contracting Group, we specialize in high-performance detached ADUs that offer uncompromising quality and architectural synergy with your primary residence. As a fully licensed B-General Contractor based in Van Nuys, we take pride in serving our neighbors across the San Fernando Valley and Los Angeles with integrity and precision. When you choose us, you are partnering with a team dedicated to transparency, safety, and superior craftsmanship, ensuring your new backyard home is built to the highest standards.

Request a Quote
  • Design & Permit Mastery

    Navigating the architectural and permitting phase for new construction is complex. We manage every detail—from soil reports to LADBS setbacks and zoning compliance—ensuring your standalone project stays on schedule and meets all California residential codes.
  • Guaranteed Fixed Estimates

    New ground-up builds shouldn't come with financial surprises. We provide comprehensive, line-item estimates after a thorough site evaluation. By value-engineering your project from the start, we eliminate hidden costs and ensure your investment is protected.
  • Engineered for Longevity

    We build homes, not just units. From reinforced foundations to high-efficiency climate control and premium insulation, we stand behind our structural integrity with a comprehensive warranty. We ensure your ADU remains a valuable, low-maintenance asset for decades.

Frequently Asked Questions

Planning an ADU, kitchen, or bathroom in LA? Get expert answers to start your project right.

In most Los Angeles areas, especially those near public transit, current California law (SB 9 and ADU mandates) eliminates the requirement to replace covered parking when converting an existing garage. This makes the process much more affordable and feasible for most homeowners.

A custom build usually takes 9-12 months: 3-5 months for design and LADBS permits, and 6-7 months for construction and final inspections.

Not necessarily. We conduct a structural assessment to ensure your existing slab can support the new living space. If needed, we perform minor retrofitting or moisture barrier installation to meet modern California residential building codes.

ADU construction costs in Los Angeles vary based on the project type, square footage, and chosen finishes. At Kobzev Pro Contracting Group, we offer transparent, value-driven pricing to help you maximize your ROI:

  • Garage to ADU Conversions: Pricing typically starts at $250 per sq. ft. Since we leverage your existing structure, this is the most cost-effective way to add a legal living unit to your property.
  • New Ground-Up ADU Construction: For detached or attached units built from scratch, pricing starts at $300 per sq. ft. This covers complete site preparation, new foundation, framing, and full utility integration.

Please note: These are baseline investment figures for standard designs. Final pricing depends on your specific architectural choices, material selections (Standard vs. Luxury), LADBS permit fees, and the complexity of utility hookups. Contact us for a detailed, line-item estimate tailored to your lot.

While every project is unique, a standard Garage Conversion in Los Angeles typically takes 2 to 4 months for construction, once permits are issued. The permitting phase can take an additional 2–4 months depending on the city’s current backlog. We provide a detailed timeline before we start.

We trench new lines for sewer, water, and electricity directly to the main house or a separate meter. We manage all coordination with LADWP and the city.

Start Your Ground-Up ADU Project Today

Stop dreaming about a guest house and start building your property’s legacy. Whether you need a high-yield rental or a private luxury retreat, Kobzev Pro Contracting Group team provide the engineering expertise and design vision to make it happen. From site grading to the final walkthrough, we handle the entire ground-up journey for you.

Alex

Project estimator
with years of
experience.

Alex vesa photo
Quote Form

OUR SPECIALIZATIONS

Explore Our Additional ADU & Remodeling Services