Common Questions About Construction & Remodeling
Undertaking a construction project in Los Angeles can raise many questions. We believe in total transparency. Below, we have compiled answers to the most common inquiries regarding ADUs, garage conversions, and home renovations to help you start your project with confidence
On average, construction takes 4 to 6 weeks. We recommend setting up a temporary kitchenette (microwave/fridge) in another room during this time.
A minor remodel (keeping the layout) starts around 25k−35k. A full custom renovation with layout changes and new cabinets typically ranges from $50k to $80k+. We provide a detailed quote based on your material choices.
Your taxes will increase, but only based on the value of the new construction (the ADU itself). The base tax rate of your main house will typically remain the same (thanks to Prop 13).
Yes! State laws encourage ADUs for rental housing. You can rent it out long-term to generate passive income immediately.
In Los Angeles, the permitting process usually takes 2 to 4 months, depending on the city’s backlog. Once permits are issued, construction takes another 3–4 months.
Costs vary by type. Garage conversions typically start around 100k−130k, while detached new construction ranges from $250k to $400k+. We provide free detailed estimates based on your specific lot.
Yes. While we don’t sell materials directly, we guide you through the selection process, recommending trusted local suppliers for tile, fixtures, and vanities to ensure quality and compatibility.
Yes! For bathroom and kitchen remodels, most clients stay home. We isolate the work zone to minimize dust and noise disruption. We just ask that you have access to a secondary bathroom/kitchenette if needed.
A standard bathroom remodel typically takes 1 to 3 weeks. Larger master bathrooms or projects involving layout changes may take 4–5 weeks.
For cosmetic changes (tile, paint, cabinets), usually no. But if we are moving plumbing, changing electrical, or removing walls, a city permit is required. As a licensed contractor, we handle all necessary permits for you.
We are based in Van Nuys and serve the entire San Fernando Valley and greater Los Angeles area. Our primary service areas include Encino, Sherman Oaks, Studio City, Woodland Hills, Santa Monica, and Hollywood.
The cost varies significantly based on size, finishes, and site conditions. Generally, Garage Conversions are the most cost-effective option, while new ground-up construction costs more per square foot. We offer Free Estimates to give you an accurate, transparent price based on your specific property and goals.
Yes! We understand that remodeling can be disruptive, so we take extra care to seal off the construction area with dust barriers and protect your floors. For a standard bathroom remodel (taking 2–3 weeks), you can stay in your home comfortably, provided you have another bathroom available for use.
While every project is unique, a standard Garage Conversion in Los Angeles typically takes 3 to 4 months for construction, once permits are issued. The permitting phase can take an additional 2–4 months depending on the city’s current backlog. We provide a detailed timeline before we start.
Absolutely. We are a full-service design-build company. This means we handle the entire process, including architectural drawings, engineering, and navigating the Los Angeles Department of Building and Safety (LADBS) to secure all necessary permits for your ADU or remodel.
Yes, Kobzev Pro Contracting Group is a fully licensed B-General Building Contractor in the State of California. We carry full General Liability insurance and Worker’s Compensation coverage to protect your property and our team throughout the entire project.